I would like to take the time to congratulate Bible Eectric for the work that they performed at Western State College Student Center. The Project presented many challenges with changes to scope, addition to scope, and also with a very tough schedule to maintain. These Individuals have·been on site for approximately sixteen months and have made many sacrifices as well as shown great dedication to Nunn Construction and the project.
It would be my pleasure to team up with Bible Electric and these two individuals on future projects.